Page 9 of 15
Re: cheater mk 2.4 strip build
Posted: 02 Dec 2018, 19:28
by cheaterparts
peatop wrote:Is this your first attempt at building a watercraft Cheater?
pretty much and first real wood project and yes first go at building a kayak , so it's a learning curve - never worked with Epoxy ether
everything is slower than welding
Re: cheater mk 2.4 strip build
Posted: 02 Dec 2018, 19:40
by Seasherpa
cheaterparts wrote:never worked with Epoxy ether everything is slower than welding
Wait a month for the temps to get up and you'll change your mind
Re: cheater mk 2.4 strip build
Posted: 02 Dec 2018, 20:04
by laneends
creating a sexy beast there, going to turn some heads
Re: cheater mk 2.4 strip build
Posted: 02 Dec 2018, 22:19
by peatop
cheaterparts wrote:peatop wrote:Is this your first attempt at building a watercraft Cheater?
pretty much and first real wood project and yes first go at building a kayak , so it's a learning curve - never worked with Epoxy ether
everything is slower than welding
Hmm i don't know about that, when i worked at cogee beach on the tugs, they seemed to take forever to complete lol
Yah as Eoin says the apoxy goes off real quick once the temp gets higher than 25c then as it gets hotter you need to cool the workshop down to make it more manageable as it goes of to fast.
Re: cheater mk 2.4 strip build
Posted: 03 Dec 2018, 07:32
by Reeling
Reeling wrote:Any updates mate?
I ask, and you deliver
You've got to please with that Cheater, it looks great!
Re: cheater mk 2.4 strip build
Posted: 03 Dec 2018, 14:16
by Kiwidundee
Its a beautiful thing. Will be a shame to drag it through WP mud.
Re: cheater mk 2.4 strip build
Posted: 03 Dec 2018, 14:25
by laneends
Kiwidundee wrote:Its a beautiful thing. Will be a shame to drag it through WP mud.
First scratch is gonna hurt
Re: cheater mk 2.4 strip build
Posted: 03 Dec 2018, 15:08
by aussieDave
Looks very nice Steve, I can't wait to see it on the water
Re: cheater mk 2.4 strip build
Posted: 24 Feb 2019, 20:35
by cheaterparts
Update time ----
with the Gippsland Paddle Challenge getting closer I thought I better do some more work on the kayak build - I have been a little slack working on it
so Saturday I cleaned up the coming , that was a fair bit of sanding and some grinding then glued it onto the deck with some epoxy and wood flour mix
then Sunday more cleaning up and more sanding on the coming putting a nice radius around the inside - I will run a layer of glass over it hopefully this week
I have cut out and glued the rear hatch seal backing and also the same step for the rudder housing cover
not much room for clamps on the steer cover hole
both of these will also get a layer of glass under them again this week and of cause some cleaning up along the top edge
then is only fit the rudder tube and build the housing for the steering mechanism and the deck and hull can be joined up making a kayak
so if all goes well that should be close by the week end
Re: cheater mk 2.4 strip build
Posted: 24 Feb 2019, 21:24
by Yako
Hey Stephen, Darn it’s looking good, Yeehaa
Looking forward to seeing it all finished up
Hopefully you can get a few paddles in before the Gippy Challenge.